preparing site
AN EXPERT CAN MAKE ALL THE DIFFERENCE in building a good ROAD!!

Road work involves installing proper drainage
Road work involves installing proper drainage as part of the construction.

Trucking in road base materials
Trucking in road base materials will be necessary when material is not on site.

commercial site preparation
We are qualified for all Commercial and Residential job sites in Western Washington.

Excavation to sub grade of road
Excavation to sub grade of road is in progress. Drainage is also needed to ensure
a good road base.

storm drainage work in progress
Excavation and storm drainage work in progress to create a road.

Water main utility connection being installed
Water main utility connection being installed at street connection.

Road base at sub grade being built
Road base at sub grade being built before paving of new road.

standard fire hydrant assembly is installed
As a standard fire hydrant assembly is installed, a concrete thrust block is
placed behind fire hydrant in case of pressure surge of water pressure.

72' storm pipe
72' storm pipe is designed to retain water that runs off of roads.

72' storm pipe is being connected to a 54' manhole
The 72' storm pipe is being connected to a 54' manhole 20' deep. Manholes are a
structure used to access storm pipe.

Under ground bore is being done
Under ground bore is being done under Burlington Northern Railroad in order to install
a new sewer main for a commercial building.

Side sewer connection is under construction
Side sewer connection is under construction for service to a new residential housing platt.

De-watering in progress
De-watering in progress to maintain water table so the crew can complete installation of side sewer.