Side Hill Repair

removing all unsuitable material down to solid ground
After a hill side fails and dirt slides away, you must remove all unsuitable material
down to solid ground. Plastic is put in place to protect soil while the repair is underway.

a drainage system is installed to remove ground water
After Excavation of unsuitable soil a drainage system is installed to remove ground water
from hillside.

Excavation of unsuitable soil being loaded and trucked out
Excavation of unsuitable soil being loaded and trucked out.

Installation of drainage pipe
Installation of drainage pipe to direct water and secure hillside from further erosion.

6' rock is put in place to stabilize hill
Once drainage pipe is installed, 6' rock is put in place to stabilize hill.

Using heavy equipment to move rock into place to set grade
Using heavy equipment to move rock into place to set grade.

Grading of 6' rock
Grading of 6' rock has been placed to match existing slope of hill side.

setting rock grade on a steep slope after drainage is installed
Heavy equipment is setting rock grade on a steep slope after drainage is installed.

Rock is being trucked in
Rock is being trucked in and dumped at top of grade and being distributed by heavy equipment.

drainage pipe is hooked into a storm drain system
After hillside has been repaired and stabilized the drainage pipe is hooked into a
storm drain system.